Ready-Mix Concrete Order Calculator

Calculate ready-mix concrete order volume in cubic yards or cubic meters and estimate mixer truckloads.

Project Measurements & Options

ft
in

Calculated Estimate

Live
Ready-Mix Order Volume
9.6 cu yd

1 mixer truck load (cap. 10 cu yd/truck)

Net Geometric Volume (Exact)
8.89 cu yd (6.8 m³)
Order Volume (with waste) (Purchase Qty)
9.6 cu yd (7.34 m³)
Estimated Truckloads (Purchase Qty)
1
Estimated Material Cost (Estimated Cost)
$1,584.00

Planning note: Estimates execute locally in your browser. Always confirm package yields and site tolerances before ordering; not a substitute for structural engineering.

How This Calculator Works

Converts pour dimensions into net volume, applies over-order allowance, and divides by mixer truck capacity to estimate truckload trips.

When to Use It

  • Scheduling ready-mix delivery trucks for driveways, slabs, or garage floors.

Required Measurements

  • Pour length, width, depth, truck capacity (commonly 8–10 cu yd or 6–8 m³), and over-order buffer.

Mathematical Formulas

Order Volume & Truckloads

Order = L × W × D × (1 + Waste%); Trucks = ceil(Order / TruckCapacity)

TruckCapacity:
Legal payload volume per mixer truck

Worked Example: 24×24 ft Garage Slab at 5 in Depth

8% allowance, 10 cu yd truck capacity.

Example Inputs

  • 24×24 ft
  • 5 in
  • 8% allowance
  • 10 cu yd/truck

Step-by-Step Math

  1. Net = 24×24×(5/12) = 240 cu ft = 8.889 cu yd.
  2. With 8% = 9.60 cu yd -> 1 truckload.

Result: 9.60 cu yd (1 truckload).

Understanding Your Results

Exact Mathematical Output
Direct geometric or physical quantity computed from your entered dimensions before rounding.
Recommended Purchase Quantity
Whole bags, boxes, sheets, or units rounded upward so your order covers the waste-adjusted target.
Estimated Cost
Calculated strictly from your entered unit price without assumed market rates.

Assumptions

  • Uniform pour thickness across prepared base.

Common Calculation Mistakes

  • Running short by 0.25 cu yd and paying a steep short-load fee for a second truck.

Scope, Safety Boundaries & Limitations

Safety boundary: Order planning only; confirm truck access weight limits and pump priming volume with your supplier.

  • Does not specify concrete slump, air entrainment, or structural reinforcement.
Formula & Unit References: NIST / ISO 80000-3 International Unit Definitions — Exact SI length, mass, and volume conversion factors (0.3048 m/ft, 0.45359237 kg/lb, 3.785411784 L/US gal)

Frequently Asked Questions

Why add 5%–10% to a ready-mix order?

Uneven gravel subbase, edge form bow, and pump hopper residue easily consume 0.3–0.5 cu yd on medium slabs.